# KAMP Oberhausen DC

KAMP Oberhausen DC is a data centre project in Vestische Straße 89-91, 46117 Oberhausen. The reported operator is KAMP.

Canonical: https://eloragrid.ai/land-grid/data-centres/germany/kamp-oberhausen-dc-56d67942818e
Status: Operating
Operator: KAMP
Evidence reviewed: 2026-11-10

## About this location

KAMP Oberhausen DC is a data centre project in Vestische Straße 89-91, 46117 Oberhausen. The reported operator is KAMP.

## Status evidence

Current named primary operating-facility roster/certificate explicitly identifies computing services at this facility. Undated primary pages are reviewed10November2026 without inventing a publication date. Current Beckum municipal service/privacy disclosure explicitly identifies hosting in this named KAMP DC and physical address. Current operator offers computing colocation separately; government NRW point inventory is dated1September2024, notMarch2026service deployment.

## Location evidence

Published primary facility address is reconciled with the reviewed matching street/house/locality in OpenStreetMap Nominatim. The circle covers locator extent plus uncertainty. Map tags never establish computing identity.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [KAMP current owned DC colocation services](https://www.kamp.de/index.php) — 
- [Beckum municipality names current KAMP DC and address](https://www.beckum.de/informationen/datenschutzerklaerung/) — 
- [NRW official public Rechenzentren point layer](https://arcgis.energieatlas.nrw.de/arcgis/rest/services/Waermekataster/2026_03_12_EnergieatlasNRW_Waermekataster_V1/MapServer/16) — 2024-09-01
- [OpenStreetMap Nominatim primary-address geocoding](https://nominatim.openstreetmap.org/search?q=Vestische+Stra%C3%9Fe+89-91%2C+46117+Oberhausen%2C+Germany&format=jsonv2&addressdetails=1&limit=3&countrycodes=de) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
