# Microsoft Kemps Creek — Building Two (Stage 2)

Microsoft identifies Building Two as the second construction stage at Kemps Creek, separate from the operational Building One. The builder’s Stage 2 document register identifies SSD-10101987. Microsoft reported Building Two construction advancing in May 2026.

Canonical: https://eloragrid.ai/land-grid/data-centres/australia/new-south-wales/kemps-creek-data-centre-373bdd5ae9
Status: Planning approved
Operator: Unknown
Evidence reviewed: 2026-11-05

## Documented scope

Microsoft identifies Building Two as the second construction stage at Kemps Creek, separate from the operational Building One. The builder’s Stage 2 document register identifies SSD-10101987. Microsoft reported Building Two construction advancing in May 2026.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Original source](https://www.planningportal.nsw.gov.au/major-projects/projects/kemps-creek-data-centre-mod-1-data-hall-fit-out) — 
- [Original source](https://local.microsoft.com/blog/kemps-creek-datacentre-overview/) — 
- [Microsoft Kemps Creek Building Two (OSM SYD06) — retained reference](https://local.microsoft.com/blog/kemps-creek-datacentre-overview/) — 
- [Microsoft Kemps Creek Building Two (OSM SYD06) — retained reference](https://maps.six.nsw.gov.au/arcgis/rest/services/sixmaps/PropertyAddress/MapServer/3) — 
- [Microsoft Kemps Creek Building Two (OSM SYD06) — retained reference](https://maps.six.nsw.gov.au/arcgis/rest/services/sixmaps/PropertyAddress/MapServer/3/query?f=json&where=1%3D1&geometry=%7B%22x%22%3A+150.77556885%2C+%22y%22%3A+-33.836278449999995%2C+%22spatialReference%22%3A+%7B%22wkid%22%3A+4326%7D%7D&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=address%2Chousenumber%2Cgurasid%2Clastupdate&returnGeometry=false) — 
- [Appendix 22 - Services Infrastructure Assessment](https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-10101987%2120210914T054855.091+GMT) — 
- [MOD 1 - Assessment Report](https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-10101987-MOD-1%2120241119T032505.604+GMT) — 
- [WaterNSW response - SEARs request SSD 10101987](https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=PAE-10103180%2120201029T013556.399+GMT) — 
- [Kemps Creek Data Centre — retained reference](https://www.planningportal.nsw.gov.au/major-projects/projects/kemps-creek-data-centre-mod-1-data-hall-fit-out) — 
- [Kemps Creek Data Centre — retained reference](https://www.planningportal.nsw.gov.au/major-projects/projects/kemps-creek-data-centre) — 
- [Microsoft — Kemps Creek construction and operation update](https://local.microsoft.com/blog/kemps-creek-datacentre-overview/) — 
- [Microsoft — Kemps Creek, May 2026 Building Two update](https://local.microsoft.com/blog/kemps-creek-datacentre-overview/) — 
- [A W Edwards — Building Two (Stage 2), SSD-10101987 project documents](https://awedwards.com.au/information-for-our-community-stage2/) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.