# LCL Brussels North Diegem

LCL Brussels North Diegem is a data centre project in Kouterveldstraat 13, 1831 Diegem. The reported operator is LCL Belgium.

Canonical: https://eloragrid.ai/land-grid/data-centres/belgium/lcl-brussels-north-diegem-b1a3d361da62
Status: Operating
Operator: LCL Belgium
Evidence reviewed: 2026-11-10

## About this location

LCL Brussels North Diegem is a data centre project in Kouterveldstraat 13, 1831 Diegem. The reported operator is LCL Belgium.

## Status evidence

Current first-party dedicated facility page/roster explicitly offers computing/colocation services at this named facility. Undated primary pages are reviewed on2026-11-10, without an invented publication date. Current operator identifies five service DC sites; November2025 ISO27001 recertification explicitly covers all LCL sites. Dedicated exact street-address corroboration remains partial. Expired older TIA certificates are address evidence only, not a claim of current certification.

## Location evidence

Primary operator/official record establishes the facility address. Reviewed OpenStreetMap address match locates the published street/house/locality; computing identity is never inferred from map tags. Circle allows address/footprint uncertainty.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [LCL current DC roster and links](https://www.lcl.be/en/) — 
- [LCL site addresses and facility operational scope 2024 sustainability report](https://sustainability.lcl.be/en/) — 
- [LCL current ISO27001 facility-scope certificate](https://www.lcl.be/en/our-certificates/iso-27001/) — 
- [LCL current facility contact addresses](https://www.lcl.be/en/contact/) — 
- [OpenStreetMap Nominatim primary-address geocoding](https://nominatim.openstreetmap.org/search?q=Kouterveldstraat+13%2C+1831+Diegem%2C+Belgium&format=jsonv2&addressdetails=1&limit=3&countrycodes=be) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
