# Meramec Valley Technology Park (Beltline Energy)

Meramec Valley Technology Park (Beltline Energy) is listed in Missouri.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/missouri/meramec-valley-technology-park-beltline-energy-49f8ed6e718cdca66004
Status: planning_approved
Operator: Beltline Energy (BLE Landholdings, LLC)
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Missouri, with Beltline Energy (BLE Landholdings, LLC) listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/beltline-meramec-valley-technology-park-pacific-mo) — Latest available status in the dated source record. Status source record date: 2026-10-28.
- [Franklin County commissioners approve rezoning for Beltline and Gateway Digital Campus data centers](https://spectrumlocalnews.com/mo/st-louis/news/2026/09/16/franklin-county-beltline-gateway-digital-campus-data-centers) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.