{"id": "US:dc:e3d64b909db8f3e604d7", "slug": "merrimack-station-data-center-proposed-bow-e3d64b909db8f3e604d7", "kind": "data-centres", "name": "Merrimack Station Data Center (proposed, Bow)", "url": "https://eloragrid.ai/land-grid/data-centres/united-states/new-hampshire/merrimack-station-data-center-proposed-bow-e3d64b909db8f3e604d7", "map_url": "https://eloragrid.ai/land-grid?region=US&record=dc%3Ae3d64b909db8f3e604d7", "country": "US", "country_name": "United States", "region": "NH", "region_name": "New Hampshire", "locality": "Bow", "address": "97 River Rd", "operator": "Granite Shore Power (site owner; end developer not publicly identified)", "status": "in_planning", "geometry": {"type": "Point", "coordinates": [-71.491166071995, 43.149828413041]}, "location_uncertainty": {"precision": "", "radius_m": null}, "summary": "Merrimack Station Data Center (proposed, Bow) is listed in Bow, New Hampshire.", "paragraphs": [{"heading": "Project overview", "text": "Data center project in Bow, New Hampshire, with Granite Shore Power (site owner; end developer not publicly identified) listed as operator."}], "facts": [{"label": "City or locality", "value": "Bow"}, {"label": "County", "value": "Merrimack"}, {"label": "Reported address", "value": "97 River Rd"}, {"label": "Reported operator", "value": "Granite Shore Power (site owner; end developer not publicly identified)"}, {"label": "Project milestone", "value": "2026-04-23 \u00b7 Proposed"}, {"label": "Reported utility", "value": "Eversource (Public Service Company of New Hampshire)"}, {"label": "Map locator scope", "value": "Approximate street address location from the U.S. Census Bureau"}, {"label": "Reported project stage", "value": "In planning"}, {"label": "Status source record date", "value": "2026-10-26"}], "metrics": [], "sources": [{"title": "Compute Atlas", "url": "https://www.compute-atlas.com/facilities/granite-shore-merrimack-station-bow-nh", "note": "Latest available status in the dated source record. Status source record date: 2026-10-26."}, {"title": "PSNH/Eversource FERC filing (Accession 20260423-5055, filed 2026-04-23): Viability Assessment Agreement VSA-PSNH-001 with Granite Shore Power, LLC for a potential 350 MW load interconnection", "url": "https://www.concordmonitor.com/wp-content/uploads/2026/09/Eversource-connection-for-data-center.pdf", "note": ""}, {"title": "U.S. Census Bureau Geocoder", "url": "https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=97+RIVER+RD%2C+BOW%2C+NH%2C+03304&benchmark=Public_AR_Current&format=json", "note": "Interpolated address-range locator from the public TIGER benchmark."}], "opportunity": null, "reviewed_on": "2026-11-09", "updated_at": "2026-11-09T22:23:35.299882+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}