# Merrimack Station Data Center (proposed, Bow)

Merrimack Station Data Center (proposed, Bow) is listed in Bow, New Hampshire.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/new-hampshire/merrimack-station-data-center-proposed-bow-e3d64b909db8f3e604d7
Status: in_planning
Operator: Granite Shore Power (site owner; end developer not publicly identified)
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Bow, New Hampshire, with Granite Shore Power (site owner; end developer not publicly identified) listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/granite-shore-merrimack-station-bow-nh) — Latest available status in the dated source record. Status source record date: 2026-10-26.
- [PSNH/Eversource FERC filing (Accession 20260423-5055, filed 2026-04-23): Viability Assessment Agreement VSA-PSNH-001 with Granite Shore Power, LLC for a potential 350 MW load interconnection](https://www.concordmonitor.com/wp-content/uploads/2026/09/Eversource-connection-for-data-center.pdf) — 
- [U.S. Census Bureau Geocoder](https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=97+RIVER+RD%2C+BOW%2C+NH%2C+03304&benchmark=Public_AR_Current&format=json) — Interpolated address-range locator from the public TIGER benchmark.

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.