{"id": "US:dc:0c86a022ad425a1bf045", "slug": "meta-el-paso-ai-data-center-campus-0c86a022ad425a1bf045", "kind": "data-centres", "name": "Meta El Paso AI Data Center Campus", "url": "https://eloragrid.ai/land-grid/data-centres/united-states/texas/meta-el-paso-ai-data-center-campus-0c86a022ad425a1bf045", "map_url": "https://eloragrid.ai/land-grid?region=US&record=dc%3A0c86a022ad425a1bf045", "country": "US", "country_name": "United States", "region": "TX", "region_name": "Texas", "locality": "El Paso", "address": "", "operator": "Meta", "status": "under_construction", "geometry": null, "location_uncertainty": {"precision": "", "radius_m": null}, "summary": "Meta El Paso AI Data Center Campus is listed in El Paso, Texas.", "paragraphs": [{"heading": "Project overview", "text": "Data center project in El Paso, Texas, with Meta listed as operator."}], "facts": [{"label": "City or locality", "value": "El Paso"}, {"label": "County", "value": "El Paso"}, {"label": "Reported operator", "value": "Meta"}, {"label": "Reported site area", "value": "1,000 acres"}, {"label": "Reported utility", "value": "El Paso Electric"}, {"label": "Reported cooling design", "value": "closed loop"}, {"label": "Reported project stage", "value": "Under construction"}, {"label": "Status source record date", "value": "2026-10-22"}], "metrics": [], "sources": [{"title": "Compute Atlas", "url": "https://www.compute-atlas.com/facilities/meta-el-paso-tx", "note": "Latest available status in the dated source record. Status source record date: 2026-10-22."}], "opportunity": null, "reviewed_on": "2026-11-09", "updated_at": "2026-11-09T22:23:35.299882+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}