# Microsoft Alviso Phase 2 Greenfield Development

Microsoft Alviso Phase 2 Greenfield Development is a data center development record in California.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/california/microsoft-alviso-phase-2-greenfield-development-f6b5fa8b19a23084ffa5
Status: under_construction
Operator: Unknown
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [HITT Contracting](https://www.hitt.com/news-hub/hitt-breaks-ground-microsoft-alviso-datacenter/) — Status observation for the listed project or phase. Status reported as of: 2026-06-10.
- [Data Center Atlas](https://geo.sanjoseca.gov/server/rest/services/OPN/OPN_OpenDataService/MapServer/36) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.