# Microsoft Heath Initial Site Preparation

Microsoft Heath Initial Site Preparation is a data center development record in Ohio.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/ohio/microsoft-heath-initial-site-preparation-78516d2ae50cacd1e943
Status: site_preparation
Operator: Unknown
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Microsoft](https://local.microsoft.com/blog/heath-datacenter-construction-updates/) — Status observation for the listed project or phase. Status reported as of: 2026-10-27.
- [Data Center Atlas](https://geocoding.geo.census.gov/geocoder/) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
