# Microsoft Silver Springs Datacenter

Microsoft reported site preparation, earthwork and utility relocation at Silver Springs in September 2026.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/nevada/microsoft-silver-springs-datacenter-current-campus-build-8deb614c4a94431040a1
Status: site_preparation
Operator: Microsoft
Evidence reviewed: 2026-11-09

## Operator update

Microsoft reported site preparation, earthwork and utility relocation at Silver Springs in September 2026.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Microsoft](https://local.microsoft.com/blog/silver-springs-datacenter-construction-update/) — Status observation for the listed project or phase. Status reported as of: 2026-09-29.
- [Data Center Atlas](https://gis.lyon-county.org/server/rest/services/Landbase/Parcels___Not_Joined_to_Assessor_Table/FeatureServer/2/query?f=json&where=STRAP%3D%2701514114%27&outFields=OBJECTID%2CAPN%2CSTRAP%2CShape__Area%2CMap_Page%2Clast_edited_date&returnGeometry=true&returnCentroid=true&outSR=4326) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.