# NTT Phoenix (Mesa) PH5 — Building 3

NTT Phoenix (Mesa) PH5 — Building 3 is a data center development record in Arizona.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/arizona/ntt-phoenix-mesa-ph5-building-3-two-storey-225-606-sq-ft-data-center-under-construction-mesa-permit-pmt24-17530-5e03a82bc3e86d88812e
Status: under_construction
Operator: NTT Global Data Centers Americas
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [City of Mesa, Arizona (Development Services)](https://citydata.mesaaz.gov/resource/cu25-6qwx.json?$select=permit_number,inspection_id,inspection_type,inspection_status,result_type,request_date,scheduled_date,inspection_completed_date,address_line1,latitude,longitude&$where=upper(address_line1)%20like%20'10256%20E%20ELLIOT%25'%20AND%20scheduled_date%3E='2026-07-01'&$order=inspection_completed_date&$limit=5000) — Status observation for the listed project or phase. Status reported as of: 2026-10-07.
- [Data Center Atlas](https://gis.mcassessor.maricopa.gov/arcgis/rest/services/Parcels/MapServer/0/query?geometry=-111.612275%2C33.35516&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=APN,APN_DASH,OWNER_NAME,MAIL_CITY,MAIL_STATE,PHYSICAL_ADDRESS,SUBNAME,LAND_SIZE,DEED_NUMBER,DEED_DATE,PUC,JURISDICTION,STR&returnGeometry=true&outSR=4326&f=json) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
