# Oak Ridge Reservation AI Data Center Sites (DOE land lease)

Oak Ridge Reservation AI Data Center Sites (DOE land lease) is listed in Oak Ridge, Tennessee.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/tennessee/oak-ridge-reservation-ai-data-center-sites-doe-land-lease-9291e7df8638518e515f
Status: in_planning
Operator: U.S. Department of Energy
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Oak Ridge, Tennessee, with U.S. Department of Energy listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/doe-oak-ridge-reservation-ai-data-centers-tn) — Latest available status in the dated source record. Status source record date: 2026-09-09.

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.