{"id": "US:dc:30c88b2712194f79d1ff", "slug": "prime-phoenix-campus-30c88b2712194f79d1ff", "kind": "data-centres", "name": "Prime Phoenix Campus", "url": "https://eloragrid.ai/land-grid/data-centres/united-states/arizona/prime-phoenix-campus-30c88b2712194f79d1ff", "map_url": "https://eloragrid.ai/land-grid?region=US&record=dc%3A30c88b2712194f79d1ff", "country": "US", "country_name": "United States", "region": "AZ", "region_name": "Arizona", "locality": "Avondale", "address": "", "operator": "", "status": "under_construction", "geometry": null, "location_uncertainty": {"precision": "", "radius_m": null}, "summary": "Prime Phoenix Campus is listed in Avondale, Arizona.", "paragraphs": [{"heading": "Project overview", "text": "Data center project in Avondale, Arizona, with Prime Data Centers listed as developer."}], "facts": [{"label": "City or locality", "value": "Avondale"}, {"label": "Reported developer", "value": "Prime Data Centers"}, {"label": "Project milestone", "value": "2026-05-21 \u00b7 Prime breaks ground on three buildings; Buildings 1\u20133 secured by a leading hyperscaler"}, {"label": "Project milestone", "value": "2023-05-04 \u00b7 Prime announces a five-building, 66.5-acre campus in Avondale"}, {"label": "Reported site area", "value": "66.5 acres"}, {"label": "Reported floor area", "value": "1,300,000 sq ft"}, {"label": "Reported building count", "value": "5"}, {"label": "Reported cooling design", "value": "closed-loop cooling engineered for zero process water use during operations"}, {"label": "Reported project stage", "value": "Under construction"}, {"label": "Status source record date", "value": "2026-11-05"}], "metrics": [], "sources": [{"title": "Data Center Census", "url": "https://datacentercensus.com/dc/prime-phoenix-avondale-az", "note": "Latest available status in the dated source record. Status source record date: 2026-11-05."}, {"title": "Prime Data Centers Breaks Ground on Three Buildings at its 240MW Campus in Phoenix, Advancing $3B Investment in Avondale", "url": "https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/", "note": ""}, {"title": "Prime Announces First Phoenix Data Center Campus", "url": "https://primedatacenters.com/news/prime-announces-its-first-phoenix-data-center-campus/", "note": ""}], "opportunity": null, "reviewed_on": "2026-11-09", "updated_at": "2026-11-09T22:23:35.299882+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}