# Project Kilby

Project Kilby is listed in Pecos, Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/project-kilby-0556be7e2cb88c8bd96c
Status: in_planning
Operator: Unknown
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Pecos, Texas, with Chevron (Energy Forge One LLC) and Joulent LLC listed as developer.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Data Center Census](https://datacentercensus.com/dc/project-kilby-reeves-county-tx) — Latest available status in the dated source record. Status source record date: 2026-10-15.
- [2026-06-10 - Energy Forge One LLC - 181895, PSDTX1684, and GHGPSDTX260 - Public Meeting](https://www.tceq.texas.gov/downloads/agency/decisions/hearings/notices/2026/2026-06-10-energy-forge-one-llc-psdtx1684-ghgpsdtx260-pm.pdf/view) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
