Project Range is listed in Buckeye, Arizona.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/arizona/project-range-74db20c40c010509ce34
Status: in_planning
Operator: Tract
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Buckeye, Arizona, with Tract listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/tract-project-range-buckeye-goodyear-az) — Latest available status in the dated source record. Status source record date: 2026-08-28.
- [Massive Data Center Master Plan Proposed in West Valley](https://azbex.com/planning-development/massive-data-center-master-plan-proposed-in-west-valley/) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.