# Project Red Clay

Project Red Clay is listed in Hayneville, Alabama.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/alabama/project-red-clay-05d7fc1ee0d5c20d6ca9
Status: planning_approved
Operator: Unknown
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Hayneville, Alabama, with Cloverleaf Infrastructure listed as developer.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Data Center Census](https://datacentercensus.com/dc/project-red-clay-lowndes-county-al) — Latest available status in the dated source record. Status source record date: 2026-10-19.
- [Lowndes Co. Commission approves controversial data center project](https://www.waka.com/2026/10/15/lowndes-co-commission-approves-controversial-data-center/) — 
- [Lowndes County, Ala., Approves $1.1B in Data Center Tax Breaks](https://govtech.com/artificial-intelligence/lowndes-county-ala-approves-1-1b-in-data-center-tax-breaks) — 
- [Data Center Gets Massive Tax Break in Surprise Vote by Lowndes Commission](https://www.selc.org/?p=44823) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
