# Red Oak PD-66R8 Data Center Complex

Red Oak PD-66R8 Data Center Complex is a data center development record in Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/red-oak-pd-66r8-data-center-complex-proposed-development-plan-zoning-case-zc26-15-ordinance-no-26-032-a98b58aab450d41faa96
Status: announced
Operator: Unknown
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [City of Red Oak, Texas](https://redoaktx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=1670,plainText=false)) — Status observation for the listed project or phase. Status reported as of: 2026-10-06.
- [Data Center Atlas](https://feature.geographic.texas.gov/arcgis/rest/services/Parcels/stratmap_land_parcels_48_most_recent/MapServer/identify?geometry=%7B%22xmin%22%3A-96.802%2C%22ymin%22%3A32.528%2C%22xmax%22%3A-96.784%2C%22ymax%22%3A32.548%2C%22spatialReference%22%3A%7B%22wkid%22%3A4326%7D%7D&geometryType=esriGeometryEnvelope&sr=4326&layers=all%3A0&tolerance=0&mapExtent=-96.83%2C32.50%2C-96.76%2C32.57&imageDisplay=1000%2C1000%2C96&returnGeometry=true&f=json) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
