# Rowan Project Temple

Rowan Project Temple is a data center development record in Temple, Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/rowan-project-temple-e6179398158c0d40f983
Status: under_construction
Operator: Rowan Digital Infrastructure
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/rowan-temple-tx) — Latest available status in the dated source record. Status source record date: 2026-10-28.
- [Data Center Atlas](https://feature.geographic.texas.gov/arcgis/rest/services/Parcels/stratmap_land_parcels_48_most_recent/MapServer/identify?geometry=-97.95%2C30.75%2C-97.05%2C31.32&geometryType=esriGeometryEnvelope&sr=4326&layers=all%3A0&layerDefs=%7B%220%22%3A%22UPPER%28OWNER_NAME%29%20LIKE%20%27%25ROWAN%20TEMPLE%25%27%22%7D&tolerance=0&mapExtent=-97.95%2C30.75%2C-97.05%2C31.32&imageDisplay=1000%2C1000%2C96&returnGeometry=true&f=json) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 
- [Data Center Atlas](https://rowan.com/rowan-closes-3b-green-financing-for-turnkey-hyperscale-campus-in-high-growth-texas-market/) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
