# Runways Information Services Limited — Slí Na Cháirde

Runways Information Services Limited — Slí Na Cháirde is a data centre project in Slí Na Cháirde, Portan, Clonee, Meath, D15 NN9V. The reported operator is Meta / Runways Information Services Limited.

Canonical: https://eloragrid.ai/land-grid/data-centres/ireland/runways-information-services-limited-sli-na-chairde-119c49cb77ce
Status: Operating
Operator: Meta / Runways Information Services Limited
Evidence reviewed: 2026-11-10

## About this location

Runways Information Services Limited — Slí Na Cháirde is a data centre project in Slí Na Cháirde, Portan, Clonee, Meath, D15 NN9V. The reported operator is Meta / Runways Information Services Limited.

## Status evidence

2025annualenvironmentalreport filed in2026 records substantial purchasedelectricity at a namedDCinstallation; latest documentaryoperation evidence is reportingyear2025, not an independent2026siteinspection.

## Location evidence

OfficialNPAD point for Runways/Cloneeexistingcampusexpansion; licenceSlíNaCháirde/Portan/Cloneeaddress and2025AER identify the samecampus.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [EPA P1192-01](https://data.epa.ie/leap/api/v1/Licence/fulllbyid?licence_id=0c626d48-c258-4ec8-85a8-f259c460efe0) — 2023-10-03
- [2025AER P1192](https://leap.epa.ie/docs/83a977fe-88cc-4bee-b532-11a09561984d.pdf) — 2026-04-02
- [Meath County Council 2460041](http://www.eplanning.ie/MeathCC/AppFileRefDetails/2460041/0) — 2024-03-08
- [Meath County Council RA180030](http://www.eplanning.ie/MeathCC/AppFileRefDetails/RA180030/0) — 2018-01-17
- [Meath County Council RA180048](http://www.eplanning.ie/MeathCC/AppFileRefDetails/RA180048/0) — 2018-03-06
- [Meath County Council RA200214](http://www.eplanning.ie/MeathCC/AppFileRefDetails/RA200214/0) — 2020-06-05
- [Meath County Council RA180671](http://www.eplanning.ie/MeathCC/AppFileRefDetails/RA180671/0) — 2018-07-27

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
