{"id": "US:dc:04eee622009a5886d08f", "slug": "silicon-foundation-warwood-data-center-and-energy-campus-former-centre-foundry-04eee622009a5886d08f", "kind": "data-centres", "name": "Silicon Foundation Warwood Data Center and Energy Campus (former Centre Foundry)", "url": "https://eloragrid.ai/land-grid/data-centres/united-states/west-virginia/silicon-foundation-warwood-data-center-and-energy-campus-former-centre-foundry-04eee622009a5886d08f", "map_url": "https://eloragrid.ai/land-grid?region=US&record=dc%3A04eee622009a5886d08f", "country": "US", "country_name": "United States", "region": "WV", "region_name": "West Virginia", "locality": "Wheeling", "address": "74 Warwood Avenue", "operator": "Silicon Foundation Energy", "status": "in_planning", "geometry": {"type": "Point", "coordinates": [-80.702999509324, 40.101341895651]}, "location_uncertainty": {"precision": "", "radius_m": null}, "summary": "Silicon Foundation Warwood Data Center and Energy Campus (former Centre Foundry) is listed in Wheeling, West Virginia.", "paragraphs": [{"heading": "Project overview", "text": "Data center project in Wheeling, West Virginia, with Silicon Foundation Energy listed as operator."}], "facts": [{"label": "City or locality", "value": "Wheeling"}, {"label": "County", "value": "Ohio"}, {"label": "Reported address", "value": "74 Warwood Avenue"}, {"label": "Reported operator", "value": "Silicon Foundation Energy"}, {"label": "Project milestone", "value": "2026-06-22 \u00b7 Proposed"}, {"label": "Reported site area", "value": "15 acres"}, {"label": "Map locator scope", "value": "Approximate street address location from the U.S. Census Bureau"}, {"label": "Reported project stage", "value": "In planning"}, {"label": "Status source record date", "value": "2026-10-29"}], "metrics": [], "sources": [{"title": "Compute Atlas", "url": "https://www.compute-atlas.com/facilities/silicon-foundation-warwood-wheeling-ohio-county-wv", "note": "Latest available status in the dated source record. Status source record date: 2026-10-29."}, {"title": "Historic Centre Foundry Site Sold, Plans Announced for Data Center and Energy Campus in Wheeling", "url": "https://rivernews.org/2026/06/22/historic-centre-foundry-site-sold-plans-announced-for-data-center-and-energy-campus-in-wheeling/", "note": ""}, {"title": "U.S. Census Bureau Geocoder", "url": "https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=74+WARWOOD+AVE%2C+WHEELING%2C+WV%2C+26003&benchmark=Public_AR_Current&format=json", "note": "Interpolated address-range locator from the public TIGER benchmark."}], "opportunity": null, "reviewed_on": "2026-11-09", "updated_at": "2026-11-09T22:23:35.299882+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}