# Soluna Project Kati 2

Soluna Project Kati 2 is listed in Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/soluna-project-kati-2-85402d6e340f4049111c
Status: in_planning
Operator: Soluna Holdings (JV with Metrobloks)
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Texas, with Soluna Holdings (JV with Metrobloks) listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/soluna-project-kati-2-willacy-county-tx) — Latest available status in the dated source record. Status source record date: 2026-10-14.
- [Soluna Presents Q2 2026 Highlights & Business Update](https://www.solunacomputing.com/?p=16169) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
