{"id": "SE:se:dc:stack-sto01b", "slug": "stack-sto01b-9691bf7c0d62", "kind": "data-centres", "name": "STACK STO01B", "url": "https://eloragrid.ai/land-grid/data-centres/sweden/stack-sto01b-9691bf7c0d62", "map_url": "https://eloragrid.ai/land-grid?region=SE&record=se%3Adc%3Astack-sto01b", "country": "SE", "country_name": "Sweden", "region": "", "region_name": "", "locality": "Upplands V\u00e4sby", "address": "", "operator": "STACK Infrastructure", "status": "Announced", "geometry": {"type": "Point", "coordinates": [17.922318750000002, 59.5035295]}, "location_uncertainty": {"precision": "shared-campus-screening", "radius_m": 2500}, "summary": "STACK STO01B is a data centre project in Upplands V\u00e4sby. The reported operator is STACK Infrastructure.", "paragraphs": [{"heading": "About this location", "text": "STACK STO01B is a data centre project in Upplands V\u00e4sby. The reported operator is STACK Infrastructure."}, {"heading": "Status evidence", "text": "Current operator roster names STO01B. The November 2022 brochure calls it a future facility, and the 2024 financing release describes its 18MW as under development. Later commissioning or actual construction commencement has not been confirmed."}, {"heading": "Location evidence", "text": "Primary physical-site street/industrial-district description, independently geocoded to the explicitly reviewed features in the correct locality. Municipal plan and historical operator campus plan identify the same Smedbyv\u00e4gen campus. Published facility codes remain distinct; exact B building footprint unresolved. 2500m screening circle; exact building/parcel footprint not surveyed."}], "facts": [{"label": "Reported operator", "value": "STACK Infrastructure"}, {"label": "Location uncertainty", "value": "2500 m radius; not a surveyed boundary"}], "metrics": [], "sources": [{"title": "stack-sto01", "url": "https://www.stackinfra.com/locations/emea/stockholm/sto01/", "note": ""}, {"title": "stack-sto01-brochure2022", "url": "https://www.stackinfra.com/wp-content/uploads/2022/02/STACK-STO01-Nov-22-1.pdf", "note": ""}, {"title": "stack-development2024", "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-secures-3-3-billion-in-green-financing/", "note": ""}, {"title": "Reviewed known-site address/area match", "url": "https://photon.komoot.io/api/?q=Smedbyv%C3%A4gen+6+Upplands+V%C3%A4sby+Sweden&limit=5&lang=en", "note": ""}, {"title": "stack-sto01-municipal2024", "url": "https://www.upplandsvasby.se/download/18.349ae883191c36ec35d4a9/1726218121223/Planbeskrivning%2020240911.pdf", "note": ""}], "opportunity": null, "reviewed_on": "2026-11-10", "updated_at": "2026-11-11T23:27:38.605575+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}