# Stratos Project

Stratos Project is a data center development record in Utah.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/utah/stratos-project-a7a98dc377ce21ea01d7
Status: in_planning
Operator: Unknown
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Data Center Census](https://datacentercensus.com/dc/stratos-box-elder-county-ut) — Latest available status in the dated source record. Status source record date: 2026-11-09.
- [O'Leary says he didn't defame opponents of his plan for a large Utah data center](https://utahnewsdispatch.com/2026/09/24/kevin-oleary-says-he-didnt-defame-opponents-of-stratos-data-center/) — 
- [Box Elder residents organize against Stratos data center](https://www.kpcw.org/state-regional/2026-05-11/box-elder-residents-organize-against-stratos-data-center) — 
- [Renderings show vision for massive data center proposed in Utah, but permits could take years](https://utahnewsdispatch.com/2026/05/19/renderings-show-massive-data-center-box-elder-utah-permits-could-take-years/) — 
- [Hundreds cry out as Box Elder commissioners wave in massive data center](https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/) — 
- [New water rights application filed for data center plans; details of proposed facility emerge](https://www.ksl.com/article/51499244/new-water-rights-application-filed-for-data-center-plans-details-of-proposed-facility-emerge) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
