# Talavera Road Data Centre Campus Expansion

Talavera Road Data Centre Campus Expansion is a data centre project in 17-23 Talavera Road, Macquarie Park.

Canonical: https://eloragrid.ai/land-grid/data-centres/australia/new-south-wales/talavera-road-data-centre-campus-expansion-f597440fb4
Status: Planning approved
Operator: Unknown
Evidence reviewed: Not recorded

## About this location

Talavera Road Data Centre Campus Expansion is a data centre project in 17-23 Talavera Road, Macquarie Park.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Original source](https://www.planningportal.nsw.gov.au/major-projects/projects/talavera-road-data-centre-mod-1-expansion) — 
- [Original source](https://app.eloragrid.ai/land-grid-assets/data/datacentres.json) — 2026-10-21
- [OpenStreetMap building: Intellicentre 3 Super West (under construction)](https://www.openstreetmap.org/way/1298979790) — 2026-10-21
- [Historical Elora map entry — unverified candidate: datacentre:08ca50204931f90c4541008b](https://app.eloragrid.ai/land-grid-assets/data/datacentres.json) — 
- [Appendix D13 - Infrastructure Report](https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-24299707-MOD-1%2120240716T070009.168+GMT) — 
- [SSD-MOD Assessment Report](https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-24299707-MOD-1%2120241219T224421.352+GMT) — 
- [Scoping Report](https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=PDA-23007319%2120210715T085345.109+GMT) — 
- [Talavera Road Data Centre Campus Expansion — retained reference](https://www.planningportal.nsw.gov.au/major-projects/projects/talavera-road-data-centre-mod-1-expansion) — 
- [Talavera Road Data Centre Campus Expansion — retained reference](https://www.planningportal.nsw.gov.au/major-projects/projects/talavera-road-data-centre-campus-expansion) — 
- [Macquarie — IC3 Super West construction commencement and FDC appointment](https://www.macquariedatacentres.com/blog/mdc-starts-construction-on-its-ai-and-cloud-data-centre-in-sydney/) — 
- [Macquarie — IC3 Super West current project page](https://www.macquariedatacentres.com/data-centres/sydney/macquarie-park-campus/ic3-super-west/) — 
- [Macquarie — IC3 Super West specification and company contact](https://www.macquariedatacentres.com/wp-content/uploads/sites/5/2025/06/Macquarie-Data-Centres-Data-Sheet-IC3-Super-West-Data-Sheet-Specs.pdf) — 
- [Original source](https://www.macquariedatacentres.com/data-centres/sydney/macquarie-park-campus/) — 
- [Macquarie IC3 Super West — retained reference](https://www.macquariedatacentres.com/data-centres/sydney/macquarie-park-campus/) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
