# Taylor Technology Campus (Big Watt Digital and PowerHouse)

Taylor Technology Campus (Big Watt Digital and PowerHouse) is a data center development record in Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/taylor-technology-campus-big-watt-digital-and-powerhouse-b106d52d338101344fd7
Status: in_planning
Operator: Unknown
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [KUT News](https://www.kut.org/energy-environment/2026-10-09/taylor-tx-annex-data-center-power-plant) — Status observation for the listed project or phase. Status reported as of: 2026-10-09.
- [Data Center Atlas](https://feature.geographic.texas.gov/arcgis/rest/services/Parcels/stratmap_land_parcels_48_most_recent/MapServer/identify?geometry=%7B%22xmin%22%3A-97.390%2C%22ymin%22%3A30.550%2C%22xmax%22%3A-97.320%2C%22ymax%22%3A30.600%2C%22spatialReference%22%3A%7B%22wkid%22%3A4326%7D%7D&geometryType=esriGeometryEnvelope&sr=4326&layers=all:0&tolerance=0&mapExtent=-97.390,30.550,-97.320,30.600&imageDisplay=1000,1000,96&returnGeometry=true&f=json) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
