# TerraVolt Southeast Idaho Data Center Campus (Raft River)

TerraVolt Southeast Idaho Data Center Campus (Raft River) is listed in Idaho.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/idaho/terravolt-southeast-idaho-data-center-campus-raft-river-ec3f7ddb1176ddba3c78
Status: in_planning
Operator: TerraVolt Infrastructure, Inc. (subsidiary of CalEthos, Inc.)
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Idaho, with TerraVolt Infrastructure, Inc. (subsidiary of CalEthos, Inc.) listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/terravolt-raft-river-cassia-county-id) — Latest available status in the dated source record. Status source record date: 2026-10-04.
- [CalEthos, Inc. Form 8-K Exhibit 99.1: TerraVolt natural gas supply agreement for planned Southeast Idaho data center campus (May 11, 2026)](https://www.sec.gov/Archives/edgar/data/1174891/000149315226022148/ex99-1.htm) — 
- [Data center campus possible in Magic Valley as tax cuts continue (archived)](https://web.archive.org/web/20260407143944id_/https://boisedev.com/news/2026/03/16/data-micron-exemption/) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
