{"id": "US:dc:1a3bd05bb81f109c92b5", "slug": "tesla-cortex-2-0-ai-training-cluster-giga-texas-1a3bd05bb81f109c92b5", "kind": "data-centres", "name": "Tesla Cortex 2.0 AI Training Cluster (Giga Texas)", "url": "https://eloragrid.ai/land-grid/data-centres/united-states/texas/tesla-cortex-2-0-ai-training-cluster-giga-texas-1a3bd05bb81f109c92b5", "map_url": "https://eloragrid.ai/land-grid?region=US&record=dc%3A1a3bd05bb81f109c92b5", "country": "US", "country_name": "United States", "region": "TX", "region_name": "Texas", "locality": "Austin", "address": "", "operator": "Tesla", "status": "under_construction", "geometry": null, "location_uncertainty": {"precision": "", "radius_m": null}, "summary": "Tesla Cortex 2.0 AI Training Cluster (Giga Texas) is listed in Austin, Texas.", "paragraphs": [{"heading": "Project overview", "text": "Data center project in Austin, Texas, with Tesla listed as operator."}], "facts": [{"label": "City or locality", "value": "Austin"}, {"label": "County", "value": "Travis"}, {"label": "Reported operator", "value": "Tesla"}, {"label": "Reported on-site generation", "value": "30 MW"}, {"label": "Reported utility", "value": "Bluebonnet Electric Cooperative"}, {"label": "Reported cooling design", "value": "evaporative"}, {"label": "Reported project stage", "value": "Under construction"}, {"label": "Status source record date", "value": "2026-09-21"}], "metrics": [], "sources": [{"title": "Compute Atlas", "url": "https://www.compute-atlas.com/facilities/tesla-cortex-2-giga-texas-austin-tx", "note": "Latest available status in the dated source record. Status source record date: 2026-09-21."}], "opportunity": null, "reviewed_on": "2026-11-09", "updated_at": "2026-11-09T22:23:35.299882+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}