# Texas Critical Data Centers (TCDC) Phase 1 — phase of

Texas Critical Data Centers (TCDC) Phase 1 — phase of is a data center development record in Texas.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/texas/texas-critical-data-centers-tcdc-phase-1-planned-ai-data-centre-phase-of-about-200-mw-20-year-vistra-ppa-aa4a7047f9e739034b28
Status: announced
Operator: Unknown
Evidence reviewed: 2026-11-09

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [New Era Energy & Digital, Inc.](https://investors.newerainfra.ai/feed/PressRelease.svc/GetPressReleaseList?LanguageId=1&bodyType=2&pressReleaseDateFilter=3&categoryId=1cb807d2-208f-4bc3-9133-6a9ad45ac3b0&pageSize=1&pageNumber=0&tagList=&includeTags=true&year=2026&excludeSelection=1) — Status observation for the listed project or phase. Status reported as of: 2026-09-21.
- [Data Center Atlas](https://feature.geographic.texas.gov/arcgis/rest/services/Parcels/stratmap_land_parcels_48_most_recent/MapServer/identify?geometry=%7B%22xmin%22%3A-102.33%2C%22ymin%22%3A31.815%2C%22xmax%22%3A-102.29%2C%22ymax%22%3A31.85%2C%22spatialReference%22%3A%7B%22wkid%22%3A4326%7D%7D&geometryType=esriGeometryEnvelope&sr=4326&layers=all%3A0&tolerance=0&mapExtent=-102.33%2C31.815%2C-102.29%2C31.85&imageDisplay=1000%2C1000%2C96&returnGeometry=true&f=json) — Site or campus locator, as attributed in the source.
- [Data Center Atlas](https://kiankyars.github.io/datacenter-atlas/downloads/latest/projects.csv) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
