{"id": "US:dc:c760a4da74a966d03d34", "slug": "townsite-solar-2-boulder-city-data-center-c760a4da74a966d03d34", "kind": "data-centres", "name": "Townsite Solar 2 Boulder City Data Center", "url": "https://eloragrid.ai/land-grid/data-centres/united-states/nevada/townsite-solar-2-boulder-city-data-center-c760a4da74a966d03d34", "map_url": "https://eloragrid.ai/land-grid?region=US&record=dc%3Ac760a4da74a966d03d34", "country": "US", "country_name": "United States", "region": "NV", "region_name": "Nevada", "locality": "Boulder City", "address": "", "operator": "Townsite Solar 2 LLC", "status": "planning_approved", "geometry": null, "location_uncertainty": {"precision": "", "radius_m": null}, "summary": "Townsite Solar 2 Boulder City Data Center is listed in Boulder City, Nevada.", "paragraphs": [{"heading": "Project overview", "text": "Data center project in Boulder City, Nevada, with Townsite Solar 2 LLC listed as operator."}], "facts": [{"label": "City or locality", "value": "Boulder City"}, {"label": "County", "value": "Clark"}, {"label": "Reported operator", "value": "Townsite Solar 2 LLC"}, {"label": "Project milestone", "value": "2026-09-24 \u00b7 Permitted"}, {"label": "Project milestone", "value": "2026-07-06 \u00b7 Proposed"}, {"label": "Reported site area", "value": "88.5 acres"}, {"label": "Reported cooling design", "value": "closed loop"}, {"label": "Reported project stage", "value": "Planning approved"}, {"label": "Status source record date", "value": "2026-09-24"}], "metrics": [], "sources": [{"title": "Compute Atlas", "url": "https://www.compute-atlas.com/facilities/townsite-solar-2-boulder-city-nv", "note": "Latest available status in the dated source record. Status source record date: 2026-09-24."}, {"title": "Federal Board Halts 167-MW Nevada Data Center Approval", "url": "https://www.enr.com/articles/63613-federal-board-halts-167-mw-nevada-data-center-approval", "note": ""}, {"title": "TS2 Data Center Proposal (withdrawn 7.6.2026) - official Boulder City project page", "url": "https://bcnv.org/1174/TS2-Data-Center-Proposal", "note": ""}], "opportunity": null, "reviewed_on": "2026-11-09", "updated_at": "2026-11-09T22:23:35.299882+00:00", "rights": "Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted."}