# Townsite Solar 2 Boulder City Data Center

Townsite Solar 2 Boulder City Data Center is listed in Boulder City, Nevada.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/nevada/townsite-solar-2-boulder-city-data-center-c760a4da74a966d03d34
Status: planning_approved
Operator: Townsite Solar 2 LLC
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Boulder City, Nevada, with Townsite Solar 2 LLC listed as operator.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Compute Atlas](https://www.compute-atlas.com/facilities/townsite-solar-2-boulder-city-nv) — Latest available status in the dated source record. Status source record date: 2026-09-24.
- [Federal Board Halts 167-MW Nevada Data Center Approval](https://www.enr.com/articles/63613-federal-board-halts-167-mw-nevada-data-center-approval) — 
- [TS2 Data Center Proposal (withdrawn 7.6.2026) - official Boulder City project page](https://bcnv.org/1174/TS2-Data-Center-Proposal) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.
