VIRTUS Hayes campus (LONDON2) is a data centre project in Western International Park, LON2 Data Centre, Hayes Road, Hayes, UB2 5XX. The reported operator is VIRTUS HAYES LIMITED.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-kingdom/virtus-hayes-campus-london2-a534859661be
Status: Operating
Operator: VIRTUS HAYES LIMITED
Evidence reviewed: 2026-11-10

## About this location

VIRTUS Hayes campus (LONDON2) is a data centre project in Western International Park, LON2 Data Centre, Hayes Road, Hayes, UB2 5XX. The reported operator is VIRTUS HAYES LIMITED.

## Status evidence

Current undated operator page describes active delivered colocation/customer infrastructure at the matched permitted campus. Historical RFS year is contextual only.

## Location evidence

Published EA site grid reference TQ1086078690 transformed OSGB36 to WGS84; 350 m screening radius covers point placement uncertainty, not a surveyed boundary. Site address/postcode checked for locality consistency.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Western International Park,](https://environment.data.gov.uk/public-register/industrial-installations/registration/EPR-EP3247JV) — 2024-03-20
- [Hayes LONDON2 Data Centre Campus - VIRTUS Locations UK London Data Centres | Stockley Park Campus London Data Centres | ](https://virtusdatacentres.com/locations/uk/london/hayes-campus) — 
- [Current government DATC facility membership DATC/F00125](https://environment.data.gov.uk/api/file/download?fileDataSetId=e3525ee0-4725-4626-a21e-1687872602fc&fileName=Climate_Change_Agreements.xlsx) — 2026-09-18
- [Schedule4 named DC facility DATC/F00125](https://s3.amazonaws.com/thegovernmentsays-files/attachments/177/1777179-1-Umbrella_climate_change_agreement_for_the_data_centre_sector.pdf) — 2020-12-18

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.