# Vocalink Limited — Site 3De

Vocalink Limited — Site 3De is a data centre project in Bank of England Print works, Langston Road, Loughton, Essex, IG10 3TN, England. The reported operator is Vocalink Limited.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-kingdom/vocalink-limited-site-3de-746dfa97ce73
Status: Operating
Operator: Vocalink Limited
Evidence reviewed: 2026-11-10

## About this location

Vocalink Limited — Site 3De is a data centre project in Bank of England Print works, Langston Road, Loughton, Essex, IG10 3TN, England. The reported operator is Vocalink Limited.

## Status evidence

Government current2026 CCA export lists exact DATC facilityID as a current member, whose qualifying business process is a facility being used as a data centre. Historicalsite/address joined bysameID; current computinguse is a government sourced declaration, not fieldverification. Scheme membership is not a planning or generatorpermission.

## Location evidence

Published named street/campus address from2020governmentSchedule4, joined byexact stableCCA facilityID to2026membership. ONS-derived postcode lookup supplies approximate point at IG10 3TN. 1000m screeningradius shows address/campusuncertainty; addressdate2020 retained explicitly. Currentaddressconfirmation remains a gap where no first-party addressroster is linked.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Current government DATC facility membership DATC/F00141](https://environment.data.gov.uk/api/file/download?fileDataSetId=e3525ee0-4725-4626-a21e-1687872602fc&fileName=Climate_Change_Agreements.xlsx) — 2026-09-18
- [Schedule4 named DC facility DATC/F00141](https://s3.amazonaws.com/thegovernmentsays-files/attachments/177/1777179-1-Umbrella_climate_change_agreement_for_the_data_centre_sector.pdf) — 2020-12-18
- [Bulk postcode lookup for IG10 3TN](https://api.postcodes.io/postcodes) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.