# xAI Colossus 2

xAI Colossus 2 is listed in Memphis, Tennessee.

Canonical: https://eloragrid.ai/land-grid/data-centres/united-states/tennessee/xai-colossus-2-6383611b08f32f501f3a
Status: under_construction
Operator: Unknown
Evidence reviewed: 2026-11-09

## Project overview

Data center project in Memphis, Tennessee, with xAI listed as developer.

## Electrical work and project likelihood

Probability not assessed. Planning stage is not a calibrated probability.

## Sources

- [Data Center Census](https://datacentercensus.com/dc/xai-colossus-2-memphis-tn) — Latest available status in the dated source record. Status source record date: 2026-11-05.
- [xAI Faces DOJ Bid to Dismiss NAACP Clean Air Act Lawsuit](https://www.lawyer-monthly.com/2026/06/xai-doj-naacp-clean-air-act-lawsuit/) — 
- [Southaven residents sue Elon Musk's xAI alleging harm from gas turbines](https://mississippitoday.org/2026/06/09/elon-musk-mississippi-southaven-lawsuit/) — 
- [Musk's xAI gets go-ahead for 41 natural gas turbines in Mississippi to power Colossus data centers](https://www.datacenterdynamics.com/en/news/musks-xai-gets-go-ahead-for-41-natural-gas-turbines-in-mississippi-to-power-colossus-data-centers/) — 

Elora editorial summaries; linked sources and geographic data retain their respective rights. No blanket third-party licence is granted.

Nearby infrastructure does not establish an electrical connection, available capacity or an open tender.