# Time-delay stopping or opening relay

Canonical URL: https://eloragrid.ai/protection-functions/62-time-delay-stopping-or-opening-relay
Publisher: Elora Grid
Updated: 2026-10-13
Lookup label: 62
Drawing use: SLD, Schematic
Reference families: IEEE / ANSI

Introduces a documented delay in a stopping or opening operation.

## What it represents

Introduces a documented delay in a stopping or opening operation.
In a drafting package, connect this reference to the timer trigger, reset condition and control supply. The associated drawing should trace the delayed opening or stopping output; the number identifies the role and does not specify the terminal arrangement, ratings or operating settings.

## How to read it

- Identify the timer trigger, reset condition and control supply.
- Trace the delayed opening or stopping output.

## Information to show or reference

- Label the timer trigger, reset condition and control supply.
- Cross-reference the delayed opening or stopping output.
- Identify the device tag, manual revision and logic drawing that define this implementation.

## Important distinction

Device 62 concerns delayed stopping or opening; device 2 concerns delayed starting or closing.

## Facts

- ANSI / IEEE function number: 62
- Drawing context: The timer trigger, reset condition and control supply
- Application scope: Protection or apparatus-control role; exact implementation is defined by the equipment documentation.

## Public references

- [SecoGear medium-voltage switchgear application and technical guide, DET-882](https://library.e.abb.com/public/a06cf4cf38b34800b27bb337ab12f74f/DET-882%20SecoGear%205kV-15kV%20IEEE%20Metal%20Clad%20Switchgear_Application%20and%20installation%20guide.pdf) — ABB. Public manufacturer number/name association. Drafting explanations are independently written.
- [IEEE C37.2-2022: power-system device function numbers](https://ieeexplore.ieee.org/document/9984140) — IEEE. Normative device-number publication; exact edition wording and compliance require the licensed standard.

## Graphic scope

Independent original educational concept illustration by Elora Grid. Not a certified standards graphic or manufacturer footprint. Unitless; not to scale. Original artwork licence: https://creativecommons.org/licenses/by/4.0/. Publisher material is linked only.
