{"id":"mfr-abb-abb-aski-load-management-for-e-mobility-use-case-32-wallboxes-1-energy-controller-0e60498a36","name":"ABB ASKI load management for E-mobility (Use case < 32 wallboxes) 1 Energy Controller","manufacturer":"ABB","category":"automation","description":"ABB ABB ASKI load management for E-mobility (Use case < 32 wallboxes) 1 Energy Controller: original PDF for control-panel equipment layouts.","equipment":["control-panel equipment","ABB ASKI load management for E-mobility (Use case < 32 wallboxes) 1 Energy Controller"],"keywords":["ABB","ABB ASKI load management for E-mobility (Use case < 32 wallboxes) 1 Energy Controller","9AKK108472A2757"],"markets":["Global"],"marketNote":"Manufacturer source discovery; confirm the exact regional equipment configuration and certification separately.","kind":"product","sourceUrl":"https://search.abb.com/library/Download.aspx?DocumentID=9AKK108472A2757&LanguageCode=de&DocumentPartId=_Drawing%201%20PDF&Action=Launch","officialEvidenceUrl":"https://search.abb.com/library/Download.aspx?DocumentID=9AKK108472A2757&LanguageCode=de&DocumentPartId=_Drawing%201%20PDF&Action=Launch","sourcePublisher":"ABB","formats":["PDF"],"availability":"direct","accessNote":"Inspected originals are available from this website through the existing download email prompt.","checkedAt":"2026-11-11","files":[{"id":"abb-499297014272316ed7bd","name":"9AKK108472A2757.pdf","format":"PDF","purpose":"Original manufacturer drawing sheet","url":"https://search.abb.com/library/Download.aspx?DocumentID=9AKK108472A2757&LanguageCode=de&DocumentPartId=_Drawing%201%20PDF&Action=Launch&DocumentRevisionId=A","availability":"direct","bytes":597201,"sha256":"6fa223e2f82691e9d40c764a9f4f65de49246094eee1d588c2d74596d0ee6f6f","retrievedAt":"2026-11-11T05:57:55.533987+00:00","sourceCheckedAt":"2026-11-11","validation":"signature-checked","filenameBasis":"document-reference","hosted":true,"redistribution":"unknown","rightsReview":{"checkedAt":"2026-11-11","sources":["https://search.abb.com/library/Download.aspx?DocumentID=9AKK108472A2757&LanguageCode=de&DocumentPartId=_Drawing%201%20PDF&Action=Launch&DocumentRevisionId=A"],"note":"Public manufacturer/supplier CAD original inspected with its included notices; no explicit applicable reproduction prohibition identified. Rights remain unknown."},"hostingBasis":{"policy":"no-explicit-prohibition","checkedAt":"2026-11-11","evidenceUrl":"https://search.abb.com/library/Download.aspx?DocumentID=9AKK108472A2757&LanguageCode=de&DocumentPartId=_Drawing%201%20PDF&Action=Launch","attribution":"ABB"},"delivery":{"kind":"original","format":"PDF","sha256":"6fa223e2f82691e9d40c764a9f4f65de49246094eee1d588c2d74596d0ee6f6f","bytes":597201,"includes":["9AKK108472A2757.pdf"]},"documentNumber":"9AKK108472A2757","latestRevisionUrl":"https://search.abb.com/library/Download.aspx?DocumentID=9AKK108472A2757&LanguageCode=de&DocumentPartId=_Drawing%201%20PDF&Action=Launch","revision":"A","previewPages":[1],"previewGroup":"mfr-abb-abb-aski-load-management-for-e-mobility-use-case-32-wallboxes-1-energy-controller-0e60498a36","downloadUrl":"https://eloragrid.ai/tools/cad-library/download/mfr-abb-abb-aski-load-management-for-e-mobility-use-case-32-wallboxes-1-energy-controller-0e60498a36/abb-499297014272316ed7bd"}],"fileClasses":["original manufacturer drawing or model source"],"technicalFacts":[{"label":"Manufacturer drawing identity","value":"ABB ASKI load management for E-mobility (Use case < 32 wallboxes) 1 Energy Controller","sourceUrl":"https://search.abb.com/library/Download.aspx?DocumentID=9AKK108472A2757&LanguageCode=de&DocumentPartId=_Drawing%201%20PDF&Action=Launch"},{"label":"Source document","value":"9AKK108472A2757; revision A","sourceUrl":"https://search.abb.com/library/Download.aspx?DocumentID=9AKK108472A2757&LanguageCode=de&DocumentPartId=_Drawing%201%20PDF&Action=Launch&DocumentRevisionId=A"}],"applications":["switchgear","substations","microgrids"],"configurationNote":"Use the manufacturer configuration named ABB ASKI load management for E-mobility (Use case < 32 wallboxes) 1 Energy Controller.","equipmentFacts":[{"label":"Equipment / resource","value":"ABB ASKI load management for E-mobility (Use case < 32 wallboxes) 1 Energy Controller"},{"label":"Manufacturer","value":"ABB"},{"label":"Resource type","value":"Product"},{"label":"Manufacturer drawing identity","value":"ABB ASKI load management for E-mobility (Use case < 32 wallboxes) 1 Energy Controller"},{"label":"Source document","value":"9AKK108472A2757; revision A"},{"label":"Listed file formats","value":"PDF"},{"label":"Listed files","value":"1"},{"label":"Available previews","value":"1 drawing previews"},{"label":"Recorded revisions","value":"A"},{"label":"Source checked","value":"2026-11-11"},{"label":"Download access","value":"Email registration for site downloads; official source links are also available"}],"previewImage":"/tools/cad-library/drawing-preview/mfr-abb-abb-aski-load-management-for-e-mobility-use-case-32-wallboxes-1-energy-controller-0e60498a36/abb-499297014272316ed7bd?asset=356e71deaf69cb6aa08db5c93bc42c75fcae31dd7255b5d066653355b1bb1ed8","relatedReferences":[{"name":"PLC CPU module","url":"https://eloragrid.ai/objects/ga-plc-cpu-module"},{"name":"HMI touchscreen","url":"https://eloragrid.ai/objects/ga-hmi-touchscreen"}],"fileChoiceGuidance":["Use 9AKK108472A2757.pdf (revision A) to read the original sheet, including its annotations and any marked dimensions. The selected drawing sheet is page 1."],"plainEnglish":{"title":"What the equipment does","introduction":"An enclosure houses equipment and its connections. Its construction provides the environmental and access protection specified for that enclosure.","example":"Use 9AKK108472A2757.pdf (revision A) to read the original sheet, including its annotations and any marked dimensions. The selected drawing sheet is page 1.","drawings":"Use 9AKK108472A2757.pdf (revision A) to read the original sheet, including its annotations and any marked dimensions. The selected drawing sheet is page 1.","terms":[{"name":"CAD","meaning":"Computer-aided design files used to prepare drawings and models."},{"name":"Revision","meaning":"The recorded version of a drawing or model."}],"diagram":"flow","steps":["Identify ABB ASKI load management for E-mobility (Use case < 32 wallboxes) 1 Energy Controller","Choose PDF","Check the matching source configuration"],"caption":"A simplified explanation of how this item works. It does not show terminal wiring or an operating procedure.","sources":[{"label":"ABB official source","url":"https://search.abb.com/library/Download.aspx?DocumentID=9AKK108472A2757&LanguageCode=de&DocumentPartId=_Drawing%201%20PDF&Action=Launch"}],"profileId":"enclosure","checklist":["Match ABB ABB ASKI load management for E-mobility (Use case < 32 wallboxes) 1 Energy Controller and the exact source filename shown above.","The source was checked on 2026-11-11; recorded file revisions: 9AKK108472A2757.pdf — A. Use Documentation & sources to check for a newer issue."],"questions":[{"question":"Which original files are supplied for ABB ASKI load management for E-mobility (Use case < 32 wallboxes) 1 Energy Controller?","answer":"1 inspected original for ABB ABB ASKI load management for E-mobility (Use case < 32 wallboxes) 1 Energy Controller: 9AKK108472A2757.pdf (PDF)."},{"question":"Where did these ABB files come from?","answer":"ABB supplied the original files through https://search.abb.com/library/Download.aspx?DocumentID=9AKK108472A2757&LanguageCode=de&DocumentPartId=_Drawing%201%20PDF&Action=Launch. The source reference, revision, original bytes and checksum are retained with each download."}]},"canonicalUrl":"https://eloragrid.ai/tools/cad-library/equipment/mfr-abb-abb-aski-load-management-for-e-mobility-use-case-32-wallboxes-1-energy-controller-0e60498a36"}