{"schemaVersion":1,"slug":"breaker-failure-retrip-output","name":"Breaker-failure retrip output","kind":"symbol","abbreviation":"BRO","aliases":["Substation protection scheme interfaces","substations Substation protection scheme interfaces","substations","Substations","Breaker-failure state","Assigned breaker retrip"],"category":"measurement-protection","drawingTypes":["Schematic"],"referenceFamilies":["Manufacturer"],"summary":"Issues the documented repeat opening request before the assigned backup trip action.","description":["Issues the documented repeat opening request before the assigned backup trip action. A protection scheme combines measurements, decision elements and communication or trip outputs to protect a defined part of the network. A function number names a job; the scheme interface shows how that job connects to other equipment.","In a substation feeder bay, local current and voltage measurements may combine with a remote-end signal before the protection issues the assigned trip request. Backup actions use their own defined initiations and supervision. For this reference, the drawing identifies “Breaker-failure state” at the input and “Assigned breaker retrip” at the output. Retrip and upstream backup have different destinations.","Keep each protected zone, initiating quantity, blocking signal and trip destination distinct. Settings, communication performance and coordination require the approved protection study and selected relay documentation. The functional block is an independent explanation of this named application. Equipment-specific ratings, terminal connections and operating conditions must be established in the project documentation."],"readingNotes":["Start at the named input: Breaker-failure state. Identify its source device or document and the state represented on the drawing.","Follow the named output: Assigned breaker retrip. Cross-reference its destination and separate the command from confirmation that the equipment responded.","Retrip and upstream backup have different destinations.","Keep each protected zone, initiating quantity, blocking signal and trip destination distinct. Settings, communication performance and coordination require the approved protection study and selected relay documentation."],"drawingChecklist":["Label the source and connection reference for breaker-failure state.","Identify the destination and defined state of assigned breaker retrip.","Record the equipment or control-document revision supporting this functional block.","Check this application limit in the project design: Retrip and upstream backup have different destinations."],"distinction":"Retrip and upstream backup have different destinations. This reference describes the named application; it does not establish a new IEC graphical symbol, an ANSI device-function number or an exact manufacturer connection diagram.","facts":[{"label":"Representation","value":"Functional block"},{"label":"Installation focus","value":"Substations"},{"label":"Input / boundary","value":"Breaker-failure state"},{"label":"Output / connection","value":"Assigned breaker retrip"},{"label":"Lookup label","value":"BRO is a library lookup label, not a standard device designation."}],"references":[{"sourceId":"pub-function-sel-line","relevance":"Public technical context for substation protection scheme interfaces. Line protection, breaker failure, communications and protection coordination. The application text and educational graphic are independently authored; the publisher does not certify this representation."}],"related":["50bf-circuit-breaker-failure-protection","87b-busbar-differential-protection","breaker-failure-upstream-trip-matrix"],"artwork":"pi26-breaker-failure-retrip-output","publishedOn":"2026-11-03","updatedOn":"2026-11-03","provenance":"independent-public-research","representation":{"type":"functional-block","focus":"substations","family":"protection-schemes","input":"Breaker-failure state","output":"Assigned breaker retrip"},"plainEnglish":{"title":"What this block does","introduction":"Issues the documented repeat opening request before the assigned backup trip action.","example":"In a substation feeder bay, local current and voltage measurements may combine with a remote-end signal before the protection issues the assigned trip request. Backup actions use their own defined initiations and supervision. For this reference, the drawing identifies “Breaker-failure state” at the input and “Assigned breaker retrip” at the output. Retrip and upstream backup have different destinations.","drawings":"Start at the named input: Breaker-failure state. Identify its source device or document and the state represented on the drawing. Follow the named output: Assigned breaker retrip. Cross-reference its destination and separate the command from confirmation that the equipment responded.","terms":[{"name":"Input","meaning":"Breaker-failure state"},{"name":"Output","meaning":"Assigned breaker retrip"},{"name":"Application reference","meaning":"An explanation of a named drawing function or circuit relationship; the project documents define the equipment and its connections."}],"diagram":"flow","steps":["Breaker-failure state","BRO","Assigned breaker retrip"],"caption":"A reading guide. The entry's original illustration and input/output facts describe this application.","sources":[{"label":"SEL-411L line differential protection overview","url":"https://selinc.com/products/411l/"}],"profileId":"power-installation-protection-schemes"},"url":"https://eloragrid.ai/symbols/breaker-failure-retrip-output","illustration":{"url":"https://eloragrid.ai/tools/electrical-library/illustrations/breaker-failure-retrip-output.svg","scope":"Original educational concept; not an official standard graphic or product footprint","license":"https://creativecommons.org/licenses/by/4.0/"},"sources":[{"id":"pub-function-sel-line","title":"SEL-411L line differential protection overview","publisher":"Schweitzer Engineering Laboratories","url":"https://selinc.com/products/411l/","type":"manufacturer","scope":"Public explanation of communication-assisted line current differential protection and the associated terminal measurements. Product diagrams and technical papers remain on the publisher site.","checkedOn":"2026-10-13","reuse":"link-only","relevance":"Public technical context for substation protection scheme interfaces. Line protection, breaker failure, communications and protection coordination. The application text and educational graphic are independently authored; the publisher does not certify this representation."}]}