Installation focus: microgrids
Input: Availability and rotation criteria
Output: Generator priority order

Assigns the preferred generating sets according to the documented rotation rule.

## In plain English

### What this block does

Assigns the preferred generating sets according to the documented rotation rule.

### A simple example

In a microgrid power station, the controller can request an additional generator when available reserve falls and later unload a selected machine before its documented stop sequence. For this reference, the drawing identifies “Availability and rotation criteria” at the input and “Generator priority order” at the output. Maintenance and operating restrictions can override rotation.

### What the drawings help you do

Start at the named input: Availability and rotation criteria. Identify its source device or document and the state represented on the drawing. Follow the named output: Generator priority order. Cross-reference its destination and separate the command from confirmation that the equipment responded.

### Terms

- Input: Availability and rotation criteria
- Output: Generator priority order
- Application reference: An explanation of a named drawing function or circuit relationship; the project documents define the equipment and its connections.

Concept diagram: Availability and rotation criteria → MGDS → Generator priority order
A reading guide. The entry's original illustration and input/output facts describe this application.

- [AGC power management options G4, G5 and G8](https://www.deif.com/media/5a4bx0xv/agc-3-option-g4-g5-and-g8-power-management-4189340696-uk.pdf)


## What it represents

Assigns the preferred generating sets according to the documented rotation rule. Generating-set coordination decides which available machines should operate and how their power contribution is shared. Engine starting, breaker connection, load acceptance and stopping are separate stages with their own feedback.
In a microgrid power station, the controller can request an additional generator when available reserve falls and later unload a selected machine before its documented stop sequence. For this reference, the drawing identifies “Availability and rotation criteria” at the input and “Generator priority order” at the output. Maintenance and operating restrictions can override rotation.
Preserve the engine and generator electrical boundaries, command authority and source readiness. Starting duty, minimum loading, synchronising, fuel systems and cooling behavior require the selected generator documentation. The functional block is an independent explanation of this named application. Equipment-specific ratings, terminal connections and operating conditions must be established in the project documentation.

## How to read it

- Start at the named input: Availability and rotation criteria. Identify its source device or document and the state represented on the drawing.
- Follow the named output: Generator priority order. Cross-reference its destination and separate the command from confirmation that the equipment responded.
- Maintenance and operating restrictions can override rotation.
- Preserve the engine and generator electrical boundaries, command authority and source readiness. Starting duty, minimum loading, synchronising, fuel systems and cooling behavior require the selected generator documentation.

## Information to show or reference

- Label the source and connection reference for availability and rotation criteria.
- Identify the destination and defined state of generator priority order.
- Record the equipment or control-document revision supporting this functional block.
- Check this application limit in the project design: Maintenance and operating restrictions can override rotation.

## Important distinction

Maintenance and operating restrictions can override rotation. This reference describes the named application; it does not establish a new IEC graphical symbol, an ANSI device-function number or an exact manufacturer connection diagram.

## Facts

- Representation: Functional block
- Installation focus: Microgrids
- Input / boundary: Availability and rotation criteria
- Output / connection: Generator priority order
- Lookup label: MGDS is a library lookup label, not a standard device designation.

## Public references

- [AGC power management options G4, G5 and G8](https://www.deif.com/media/5a4bx0xv/agc-3-option-g4-g5-and-g8-power-management-4189340696-uk.pdf) — DEIF. Public technical context for microgrid generating-set coordination. Generator start/stop, load sharing, reserve and power management. The application text and educational graphic are independently authored; the publisher does not certify this representation.

## Graphic scope

Independent original educational concept illustration by Elora Grid. Not a certified standards graphic or manufacturer footprint. Unitless; not to scale. Original artwork licence: https://creativecommons.org/licenses/by/4.0/. Publisher material is linked only.