{"schemaVersion":1,"slug":"microgrid-generator-warm-up-completion-interface","name":"Microgrid generator warm-up completion interface","kind":"symbol","abbreviation":"MGWCI","aliases":["Microgrid generating-set coordination","microgrids Microgrid generating-set coordination","microgrids","Microgrids","Generator warm-up state","Load-acceptance readiness"],"category":"microgrid-systems","drawingTypes":["Schematic"],"referenceFamilies":["Manufacturer"],"summary":"Receives the documented ready-for-load condition after the generating set starts.","description":["Receives the documented ready-for-load condition after the generating set starts. Generating-set coordination decides which available machines should operate and how their power contribution is shared. Engine starting, breaker connection, load acceptance and stopping are separate stages with their own feedback.","In a microgrid power station, the controller can request an additional generator when available reserve falls and later unload a selected machine before its documented stop sequence. For this reference, the drawing identifies “Generator warm-up state” at the input and “Load-acceptance readiness” at the output. The generator controller defines its readiness conditions.","Preserve the engine and generator electrical boundaries, command authority and source readiness. Starting duty, minimum loading, synchronising, fuel systems and cooling behavior require the selected generator documentation. The functional block is an independent explanation of this named application. Equipment-specific ratings, terminal connections and operating conditions must be established in the project documentation."],"readingNotes":["Start at the named input: Generator warm-up state. Identify its source device or document and the state represented on the drawing.","Follow the named output: Load-acceptance readiness. Cross-reference its destination and separate the command from confirmation that the equipment responded.","The generator controller defines its readiness conditions.","Preserve the engine and generator electrical boundaries, command authority and source readiness. Starting duty, minimum loading, synchronising, fuel systems and cooling behavior require the selected generator documentation."],"drawingChecklist":["Label the source and connection reference for generator warm-up state.","Identify the destination and defined state of load-acceptance readiness.","Record the equipment or control-document revision supporting this functional block.","Check this application limit in the project design: The generator controller defines its readiness conditions."],"distinction":"The generator controller defines its readiness conditions. This reference describes the named application; it does not establish a new IEC graphical symbol, an ANSI device-function number or an exact manufacturer connection diagram.","facts":[{"label":"Representation","value":"Functional block"},{"label":"Installation focus","value":"Microgrids"},{"label":"Input / boundary","value":"Generator warm-up state"},{"label":"Output / connection","value":"Load-acceptance readiness"},{"label":"Lookup label","value":"MGWCI is a library lookup label, not a standard device designation."}],"references":[{"sourceId":"pi26-genset-control","relevance":"Public technical context for microgrid generating-set coordination. Generator start/stop, load sharing, reserve and power management. The application text and educational graphic are independently authored; the publisher does not certify this representation."}],"related":["genset-controller","diesel-generator-set","microgrid-generator-breaker-connect-request"],"artwork":"pi26-microgrid-generator-warm-up-completion-interface","publishedOn":"2026-11-03","updatedOn":"2026-11-03","provenance":"independent-public-research","representation":{"type":"functional-block","focus":"microgrids","family":"microgrid-gensets","input":"Generator warm-up state","output":"Load-acceptance readiness"},"plainEnglish":{"title":"What this block does","introduction":"Receives the documented ready-for-load condition after the generating set starts.","example":"In a microgrid power station, the controller can request an additional generator when available reserve falls and later unload a selected machine before its documented stop sequence. For this reference, the drawing identifies “Generator warm-up state” at the input and “Load-acceptance readiness” at the output. The generator controller defines its readiness conditions.","drawings":"Start at the named input: Generator warm-up state. Identify its source device or document and the state represented on the drawing. Follow the named output: Load-acceptance readiness. Cross-reference its destination and separate the command from confirmation that the equipment responded.","terms":[{"name":"Input","meaning":"Generator warm-up state"},{"name":"Output","meaning":"Load-acceptance readiness"},{"name":"Application reference","meaning":"An explanation of a named drawing function or circuit relationship; the project documents define the equipment and its connections."}],"diagram":"flow","steps":["Generator warm-up state","MGWCI","Load-acceptance readiness"],"caption":"A reading guide. The entry's original illustration and input/output facts describe this application.","sources":[{"label":"AGC power management options G4, G5 and G8","url":"https://www.deif.com/media/5a4bx0xv/agc-3-option-g4-g5-and-g8-power-management-4189340696-uk.pdf"}],"profileId":"power-installation-microgrid-gensets"},"url":"https://eloragrid.ai/symbols/microgrid-generator-warm-up-completion-interface","illustration":{"url":"https://eloragrid.ai/tools/electrical-library/illustrations/microgrid-generator-warm-up-completion-interface.svg","scope":"Original educational concept; not an official standard graphic or product footprint","license":"https://creativecommons.org/licenses/by/4.0/"},"sources":[{"id":"pi26-genset-control","publisher":"DEIF","title":"AGC power management options G4, G5 and G8","url":"https://www.deif.com/media/5a4bx0xv/agc-3-option-g4-g5-and-g8-power-management-4189340696-uk.pdf","scope":"Generator start/stop, load sharing, reserve and power management.","type":"manufacturer","checkedOn":"2026-11-03","reuse":"link-only","relevance":"Public technical context for microgrid generating-set coordination. Generator start/stop, load sharing, reserve and power management. The application text and educational graphic are independently authored; the publisher does not certify this representation."}]}