# Microgrid load-restoration eligibility

Canonical URL: https://eloragrid.ai/symbols/microgrid-load-restoration-eligibility
Publisher: Elora Grid
Updated: 2026-11-03
Lookup label: MLE
Drawing use: Schematic
Reference families: Manufacturer

Representation: Functional block
Installation focus: microgrids
Input: Reserve and load eligibility
Output: Restoration permission

Checks the defined electrical and resource conditions before a shed load can be restored.

## In plain English

### What this block does

Checks the defined electrical and resource conditions before a shed load can be restored.

### A simple example

In a microgrid island, the controller can disconnect lower-priority loads when a source is lost and later request restoration when the documented reserve and stability conditions permit it. For this reference, the drawing identifies “Reserve and load eligibility” at the input and “Restoration permission” at the output. Restoration also involves inrush and process constraints.

### What the drawings help you do

Start at the named input: Reserve and load eligibility. Identify its source device or document and the state represented on the drawing. Follow the named output: Restoration permission. Cross-reference its destination and separate the command from confirmation that the equipment responded.

### Terms

- Input: Reserve and load eligibility
- Output: Restoration permission
- Application reference: An explanation of a named drawing function or circuit relationship; the project documents define the equipment and its connections.

Concept diagram: Reserve and load eligibility → MLE → Restoration permission
A reading guide. The entry's original illustration and input/output facts describe this application.

- [Avista Shared Energy Economy microgrid protection and control case study](https://selinc.com/api/download/135486/)


## What it represents

Checks the defined electrical and resource conditions before a shed load can be restored. Load management balances the available electrical supply against the loads that remain connected. Shedding, restoration, priority and proof of disconnection are separate control functions and should remain traceable to individual load groups.
In a microgrid island, the controller can disconnect lower-priority loads when a source is lost and later request restoration when the documented reserve and stability conditions permit it. For this reference, the drawing identifies “Reserve and load eligibility” at the input and “Restoration permission” at the output. Restoration also involves inrush and process constraints.
Identify each load group, priority, measured contribution and feedback. Shedding amounts, operating times and restoration conditions require the approved power-management design and the actual connected-load data. The functional block is an independent explanation of this named application. Equipment-specific ratings, terminal connections and operating conditions must be established in the project documentation.

## How to read it

- Start at the named input: Reserve and load eligibility. Identify its source device or document and the state represented on the drawing.
- Follow the named output: Restoration permission. Cross-reference its destination and separate the command from confirmation that the equipment responded.
- Restoration also involves inrush and process constraints.
- Identify each load group, priority, measured contribution and feedback. Shedding amounts, operating times and restoration conditions require the approved power-management design and the actual connected-load data.

## Information to show or reference

- Label the source and connection reference for reserve and load eligibility.
- Identify the destination and defined state of restoration permission.
- Record the equipment or control-document revision supporting this functional block.
- Check this application limit in the project design: Restoration also involves inrush and process constraints.

## Important distinction

Restoration also involves inrush and process constraints. This reference describes the named application; it does not establish a new IEC graphical symbol, an ANSI device-function number or an exact manufacturer connection diagram.

## Facts

- Representation: Functional block
- Installation focus: Microgrids
- Input / boundary: Reserve and load eligibility
- Output / connection: Restoration permission
- Lookup label: MLE is a library lookup label, not a standard device designation.

## Public references

- [Avista Shared Energy Economy microgrid protection and control case study](https://selinc.com/api/download/135486/) — SEL. Public technical context for microgrid load shedding and restoration. Storage, protection, black start, load restoration and coordinated island operation. The application text and educational graphic are independently authored; the publisher does not certify this representation.

## Graphic scope

Independent original educational concept illustration by Elora Grid. Not a certified standards graphic or manufacturer footprint. Unitless; not to scale. Original artwork licence: https://creativecommons.org/licenses/by/4.0/. Publisher material is linked only.
