# Microgrid protection-setting-group request

Canonical URL: https://eloragrid.ai/symbols/microgrid-protection-setting-group-request
Publisher: Elora Grid
Updated: 2026-11-03
Lookup label: MPR
Drawing use: Schematic
Reference families: Manufacturer

Representation: Functional block
Installation focus: microgrids
Input: Topology and operating mode
Output: Assigned setting-group request

Requests the documented relay setting group associated with the established operating configuration.

## In plain English

### What this block does

Requests the documented relay setting group associated with the established operating configuration.

### A simple example

In a microgrid with sectionalized buses, the controller can associate each connected source and load group with its current island. A mode-dependent neutral or protection interface needs its own independently validated design. For this reference, the drawing identifies “circuit arrangement and operating mode” at the input and “Assigned setting-group request” at the output. Changing groups requires protection coordination.

### What the drawings help you do

Start at the named input: circuit arrangement and operating mode. Identify its source device or document and the state represented on the drawing. Follow the named output: Assigned setting-group request. Cross-reference its destination and separate the command from confirmation that the equipment responded.

### Terms

- Input: Topology and operating mode
- Output: Assigned setting-group request
- Application reference: An explanation of a named drawing function or circuit relationship; the project documents define the equipment and its connections.

Concept diagram: Topology and operating mode → MPR → Assigned setting-group request
A reading guide. The entry's original illustration and input/output facts describe this application.

- [Microgrid operating modes and transitions management](https://productinfo.se.com/emol_functional_specifications/doca0371_emol_functionalspecifications/EN/DOCA0371_EMOL_Functional_Specifications_DD00894746.xml/%24/EMOL_OperatingModesandTransitionsManagement_DD00895904)


## What it represents

Requests the documented relay setting group associated with the established operating configuration. Microgrid topology control tracks which sources and load sections are electrically connected. The same physical installation can form several islands, so source roles, measurement boundaries and earthing interfaces must follow the established configuration.
In a microgrid with sectionalized buses, the controller can associate each connected source and load group with its current island. A mode-dependent neutral or protection interface needs its own independently validated design. For this reference, the drawing identifies “Topology and operating mode” at the input and “Assigned setting-group request” at the output. Changing groups requires protection coordination.
Keep measured switch positions, logical island assignment and any earthing command separate. A conceptual topology block cannot establish a safe neutral-switching arrangement or prove that a circuit is de-energized. The functional block is an independent explanation of this named application. Equipment-specific ratings, terminal connections and operating conditions must be established in the project documentation.

## How to read it

- Start at the named input: Topology and operating mode. Identify its source device or document and the state represented on the drawing.
- Follow the named output: Assigned setting-group request. Cross-reference its destination and separate the command from confirmation that the equipment responded.
- Changing groups requires protection coordination.
- Keep measured switch positions, logical island assignment and any earthing command separate. A conceptual topology block cannot establish a safe neutral-switching arrangement or prove that a circuit is de-energized.

## Information to show or reference

- Label the source and connection reference for topology and operating mode.
- Identify the destination and defined state of assigned setting-group request.
- Record the equipment or control-document revision supporting this functional block.
- Check this application limit in the project design: Changing groups requires protection coordination.

## Important distinction

Changing groups requires protection coordination. This reference describes the named application; it does not establish a new IEC graphical symbol, an ANSI device-function number or an exact manufacturer connection diagram.

## Facts

- Representation: Functional block
- Installation focus: Microgrids
- Input / boundary: Topology and operating mode
- Output / connection: Assigned setting-group request
- Lookup label: MPR is a library lookup label, not a standard device designation.

## Public references

- [Microgrid operating modes and transitions management](https://productinfo.se.com/emol_functional_specifications/doca0371_emol_functionalspecifications/EN/DOCA0371_EMOL_Functional_Specifications_DD00894746.xml/%24/EMOL_OperatingModesandTransitionsManagement_DD00895904) — Schneider Electric. Public technical context for microgrid topology and earthing coordination. Grid-connected and island modes, transitions, topology and authority. The application text and educational graphic are independently authored; the publisher does not certify this representation.