Ashfords Road is a proposed four-building data centre campus at 216 Ashfords Road, Gregadoo. The current planning file is at EIS preparation and describes total proposed power consumption up to 1.4 GW.

Wagga Wagga City, New South Wales, Australia

View Ashfords Road Data Centre, Gregadoo on the map

Eis preparation

Evidence reviewed 5 Nov 2026

About Ashfords Road Data Centre, Gregadoo

Ashfords Road is a proposed four-building data centre campus at 216 Ashfords Road, Gregadoo. The current planning file is at EIS preparation and describes total proposed power consumption up to 1.4 GW.

Address
216 Ashfords Road, Gregadoo
Country
Australia
State / region
New South Wales
Status evidence
Live Major Projects listing; consent outcome not inferred from determination

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

10 records within 15 km.

WAGGA 330/132KV TSNew South WalesOperational
1.5 km
6.7 km
Show 5 more
GUGAA 330KV TSNew South Wales
10.5 km
11.1 km
11.6 km
13.2 km

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.