Data centre · Australia · New South Wales

Davis Road data centre — PAN-423778 modification

PAN-423778 is a modification application for 3 Davis Road, Wetherill Park. The retained online DA feed records a determination; that field alone does not establish the consent outcome or the detailed electrical scope. This application is retained separately from the tree-removal correction.

WETHERILL PARK, New South Wales, Australia

View Davis Road data centre — PAN-423778 modification on the map

Determined outcome unverified

Evidence reviewed 5 Nov 2026

Documented scope

PAN-423778 is a modification application for 3 Davis Road, Wetherill Park. The retained online DA feed records a determination; that field alone does not establish the consent outcome or the detailed electrical scope. This application is retained separately from the tree-removal correction.

Address
3 DAVIS ROAD WETHERILL PARK 2164
Country
Australia
State / region
New South Wales
Source date
2024-08-01
Record scope
Individual planning modification
Planning reference
PAN-423778
Filing updated
2024-08-01

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

88 records within 15 km.

Show 83 more
7.2 km
Sydney West Bulk Supply Point (BSP)Eastern Creek, New South Wales, AustraliaExisting infrastructure
7.8 km
8.9 km
10.8 km
Kemps Creek 132kV BSPNew South WalesOperational
11.6 km
11.8 km
12.9 km
13.3 km
14.1 km

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
    Original source

    2024-08-01

  2. 02
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.