Bathurst data centre — DC1 building modification
Leading Edge announced development consent in March 2021 for a data centre at 366 Panorama Avenue, Bathurst. The separate PAN-193910 modification changes the approved DC1 building from one building to two smaller buildings. Although the filing uses the term telecommunications facility, its development type is data storage premises. This is retained as a data-centre modification; the historic approval does not establish current commissioning or procurement.
MITCHELL, New South Wales, Australia
View Bathurst data centre — DC1 building modification on the map
Evidence reviewed 5 Nov 2026
Documented scope
Leading Edge announced development consent in March 2021 for a data centre at 366 Panorama Avenue, Bathurst. The separate PAN-193910 modification changes the approved DC1 building from one building to two smaller buildings. Although the filing uses the term telecommunications facility, its development type is data storage premises. This is retained as a data-centre modification; the historic approval does not establish current commissioning or procurement.
- Address
- 366 PANORAMA AVENUE MITCHELL 2795
- Country
- Australia
- State / region
- New South Wales
- Source date
- 2023-03-05
- Record scope
- Individual planning modification
- Planning reference
- PAN-193910
- Filing updated
- 2023-07-22
Electrical work and project outlook
Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.
Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.
Location and nearby places
Nearby Bulk Supply Points and substations
5 records within 15 km.
Nearby mine sites
No mine records within 15 km.
Sources and dates
Research compiled by Elora Grid.
- 01Original source
2023-03-05
- 02
- 03Retained planning filing PAN-193910
2023-03-05
- 04
Data notes
Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.