Station Road data centre — site development history

The retained 57 Station Road record includes demolition and data-storage-facility applications, associated administration and access works, and fourteen post-consent certificates. Different applications have different outcomes; the expansion project remains separately documented.

Seven Hills, New South Wales, Australia

View Station Road data centre — site development history on the map

Evidence reviewed 5 Nov 2026

Documented scope

The retained 57 Station Road record includes demolition and data-storage-facility applications, associated administration and access works, and fourteen post-consent certificates. Different applications have different outcomes; the expansion project remains separately documented.

Project research: Station Road Data Centre Expansion.

Address
57 Station Road, Seven Hills NSW 2147
Country
Australia
State / region
New South Wales
Source date
2026-10-21
Record scope
Site applications and certificates
Planning reference
PAN-199851, PAN-103932, PAN-267478
Filing updated
2026-03-22

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

82 records within 15 km.

Show 77 more
4.0 km
6.9 km
8.9 km
10.6 km
Sydney West Bulk Supply Point (BSP)Eastern Creek, New South Wales, AustraliaExisting infrastructure
12.0 km
12.6 km
14.6 km

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
    Original source

    2026-10-21

  2. 02
  3. 03
  4. 04
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.