NEXTDC S4 is a data centre project at 16 Johnston Crescent, Horsley Park. The approved development includes a 294 MW power-consumption scope and two 330 kV underground circuits to Sydney West. Multiplex reports construction in progress.

Horsley Park, New South Wales, Australia

View NEXTDC S4 Sydney on the map

Under construction

Evidence reviewed 5 Nov 2026

294 MWApproved power consumptionSSD-63741210 · 24 Dec 2025
330 kVConnection voltageTwo underground circuits
2027Target completionReported by Multiplex

About NEXTDC S4 Sydney

NEXTDC Limited is developing NEXTDC S4 Sydney at 16 Johnston Crescent, Horsley Park, NSW. Multiplex identifies the project as under construction and lists 2027 as its target completion year. The published timetable refers to construction completion.

The NSW development consent for SSD-63741210, issued on 24 December 2025, covers a data centre with 294 MW of approved power consumption, electrical substations and associated infrastructure. The consent also covers the supporting electrical infrastructure.

How S4 is proposed to connect to the grid

The planning assessment describes a proposed connection to Sydney West Bulk Supply Point (BSP) using 2 underground 330 kV circuits. The planning documents describe an approximately 2.6 km cable route between the two sites.

Sydney West is identified as a bulk supply point for Endeavour Energy. The assessment includes two additional switching bays at the existing substation.

Address
16 Johnston Crescent, Horsley Park NSW 2175
Country
Australia
State / region
New South Wales
Developer
NEXTDC Limited
Planning reference
SSD-63741210
Proposed network connection
Sydney West Transmission Substation
Network route
Approximately 2.6 km, as documented

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Documented proposed connection

Sydney West Bulk Supply Point (BSP)Two proposed 330 kV underground circuits
2.6 kmDocumented cable route

Location and nearby places

Nearby Bulk Supply Points and substations

67 records within 15 km.

Sydney West Bulk Supply Point (BSP)Eastern Creek, New South Wales, AustraliaExisting infrastructure
1.3 km
Show 62 more

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
    NSW development consent

    24 December 2025 · Schedule 1 · approval, address and 294 MW scope.

  2. 02
    HV route supplementary assessment

    Aurecon revision D · 20 August 2025 · sections 2.1, 5.1 and 5.5.

  3. 03
    Multiplex project page

    Undated participant page · construction status and target completion.

  4. 04
    Official application contact details

    3 September 2025 · Applicant Details. Contacts may have changed.

  5. 05
    Original source

    2026-10-21

  6. 06
  7. 07
  8. 08
  9. 09
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
    Multiplex — NEXTDC S4 Sydney

    Primary source reviewed 2026-11-05

Data notes