Skip to content
Elora GridLand & Grid
Data centre · Denmark

STACK COP02A

STACK COP02A is a data centre project in Blekinge Boulevard 10, Taastrup. The reported operator is STACK Infrastructure.

Høje Taastrup, Denmark

View STACK COP02A on the map

Announced

Evidence reviewed 10 Nov 2026

About this location

STACK COP02A is a data centre project in Blekinge Boulevard 10, Taastrup. The reported operator is STACK Infrastructure.

Status evidence

Operator explicitly identifies this named proposed building within the planned COP02 site. Actual commencement or commissioning has not been confirmed; environmental-screening approval is tracked separately.

Location evidence

Primary physical-site street/industrial-district description, independently geocoded to the explicitly reviewed features in the correct locality. Government physical project address and operator building code. Shared campus circle does not claim an individual proposed building footprint. 2000m screening circle; exact building/parcel footprint not surveyed.

Address
Blekinge Boulevard 10, Taastrup
Country
Denmark
Reported operator
STACK Infrastructure
Location uncertainty
2000 m radius; not a surveyed boundary

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

No substation records within 15 km.

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
  2. 02
  3. 03
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.