Data centre · Finland

Pure DC Seinäjoki SJY01A

Pure DC Seinäjoki SJY01A is a data centre project in Kivineva / Kärmeskytö, Seinäjoki. The reported operator is Pure Data Centres Group Limited.

Seinäjoki, Finland

View Pure DC Seinäjoki SJY01A on the map

Announced

Evidence reviewed 10 Nov 2026

About this location

Pure DC Seinäjoki SJY01A is a data centre project in Kivineva / Kärmeskytö, Seinäjoki. The reported operator is Pure Data Centres Group Limited.

Status evidence

Government YVA decision identifies the Pure SJY01A physical DC proposal. Later construction or commissioning has not been confirmed.

Location evidence

Primary physical-site street/industrial-district description, independently geocoded to the explicitly reviewed features in the correct locality. Government identifies Kivineva/Kärmeskytö project bounded by local roads. The named Kärmeskytö land feature is used with allowance; the homonymous Kurikka bus-stop match is rejected. 3000m screening circle; exact building/parcel footprint not surveyed.

Address
Kivineva / Kärmeskytö, Seinäjoki
Country
Finland
Reported operator
Pure Data Centres Group Limited
Source date
2025-06-26
Status observation date
2025-06-26
Location uncertainty
3000 m radius; not a surveyed boundary

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

No substation records within 15 km.

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
  2. 02
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.