Skip to content
Elora GridLand & Grid
Data centre · France

Digital Realty MRS2 Marseille

Digital Realty MRS2 Marseille is a data centre project in Enceinte Portuaire - Porte 4 Chemin du littoral bassin mirabeau 13015 Marseille. The reported operator is Digital Realty.

Marseille, France

View Digital Realty MRS2 Marseille on the map

Operating

Evidence reviewed 10 Nov 2026

About this location

Digital Realty MRS2 Marseille is a data centre project in Enceinte Portuaire - Porte 4 Chemin du littoral bassin mirabeau 13015 Marseille. The reported operator is Digital Realty.

Status evidence

Government inspection explicitly describes an operating DC at Porte 4; current roster has four Marseille centres operating and MRS5 in construction.

Location evidence

Published ICPE installation point (schematic, not surveyed). First-party facility pin for MRS2 on the operator roster; identity matched by address/code. Circle covers retained published points plus an explicit 500–1000 m screening buffer; it is a research uncertainty estimate, not a provider accuracy guarantee.

Address
Enceinte Portuaire - Porte 4 Chemin du littoral bassin mirabeau 13015 Marseille
Country
France
Reported operator
Digital Realty
Source date
2026-10-29
Status observation date
2023-03-02
Location uncertainty
700 m radius; not a surveyed boundary

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

No substation records within 15 km.

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
  2. 02
  3. 03
  4. 04
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.