Skip to content
Elora GridLand & Grid
Data centre · Germany

Datacenter Düsseldorf

Datacenter Düsseldorf is a data centre project in In der Steele 37a, 40599 Düsseldorf (Connecta Park), germany. The reported operator is NorthC.

Germany

View Datacenter Düsseldorf on the map

Operating

Evidence reviewed 10 Nov 2026

About this location

Datacenter Düsseldorf is a data centre project in In der Steele 37a, 40599 Düsseldorf (Connecta Park), germany. The reported operator is NorthC.

Status evidence

The current public government annual-report export identifies this named whole data-centre reporting unit, operator/owner, five-digit postal code, actual annual facility energy, IT connected load, computing traffic and PUE. This is computing-function evidence for reporting2025, not a generator permit or an active-company inference. Export has no street/year column; reporting2025 is explicitly inferred from annual-page latest-year wording and official statistics selector2025. November2026 download/review is not observation date. Names/codes are preserved; cooling circuits, data halls and repeated annual observations are never invented as new facilities. Exact prior facility code/name/operator and locality/postal crosswalk retains the existing identity, documentary address and stronger location. Government operator/owner fields are observations as of reporting2025, not proof of a later ownership transfer. No proximity-based merge.

Location evidence

Official named DC2025report publishes this exact five-digit postal code. Whole published postcode area. Circle encloses every returned vertex of all complete OSM postal boundary relations for German postcode40599, plus150m. Municipality/zip search area only, not a facility or corporate-office pin. OpenStreetMap contributors / ODbL. No exact street or building position is asserted.

Address
In der Steele 37a, 40599 Düsseldorf (Connecta Park), germany
Country
Germany
Reported operator
NorthC
Status observation date
2025
Location uncertainty
2275 m radius; not a surveyed boundary

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

No substation records within 15 km.

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
  2. 02
  3. 03
  4. 04
  5. 05
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.