Vantage Frankfurt FRA2 campus is a data centre project in Alexander-von- Humboldt-Straße 4, 65479 Raunheim. The reported operator is Vantage Data Centers.

Raunheim, Germany

View Vantage Frankfurt FRA2 campus on the map

Operating

Evidence reviewed 10 Nov 2026

About this location

Vantage Frankfurt FRA2 campus is a data centre project in Alexander-von- Humboldt-Straße 4, 65479 Raunheim. The reported operator is Vantage Data Centers.

Status evidence

The current public government annual-report export identifies this named whole data-centre reporting unit, operator/owner, five-digit postal code, actual annual facility energy, IT connected load, computing traffic and PUE. This is computing-function evidence for reporting2025, not a generator permit or an active-company inference. Export has no street/year column; reporting2025 is explicitly inferred from annual-page latest-year wording and official statistics selector2025. November2026 download/review is not observation date. Names/codes are preserved; cooling circuits, data halls and repeated annual observations are never invented as new facilities. Exact prior facility code/name/operator and locality/postal crosswalk retains the existing identity, documentary address and stronger location. Government operator/owner fields are observations as of reporting2025, not proof of a later ownership transfer. No proximity-based merge.

Location evidence

Exact existing reviewed facility location retained: Official source UTM zone32 site/chimney coordinates, transformed with pyproj from ETRS89/UTM32N. The circle covers all selected site points plus a250m allowance for chimney-to-facility extent and source datum/rounding uncertainty; it is not a surveyed building outline.

Address
Alexander-von- Humboldt-Straße 4, 65479 Raunheim
Country
Germany
Reported operator
Vantage Data Centers
Source date
2025-12-30
Status observation date
2025-12-30
Location uncertainty
300 m radius; not a surveyed boundary

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

No substation records within 15 km.

Nearby mine sites

No mine records within 15 km.